The build’s done. Now it has to be spotless.
Post-construction cleaning for Pittsburgh GCs, builders, and property teams. Rough clean, final clean, touch-up. We clear the dust and debris, work the deficiency list, and hand it over occupancy-ready, with photos.
Quote requests answered same day.
Three phases, the way the trade actually runs.
Post-construction cleaning is not one job. It’s a sequence, timed to the build. We run the phases you need and skip the ones you don’t.
Rough clean
After the trades rough out, before finishes. Debris haul, dust knockdown, floors swept and prepped so the finish crews work clean.
Final clean
The detail pass. Dust from every surface, fixtures and glass, inside cabinets and appliances, paint and adhesive spots, floors brought to finish. This is the one that makes it show.
Touch-up
Right before handover or occupancy. We clear the settling dust, hit the punch-list areas, and clean anything the last trades left behind. Occupancy-ready, not almost-ready.
Your name is on the handover. So is ours.
A dusty final walk costs you the client’s confidence. So we treat the clean like the last trade on the job: sequenced, documented, and done to a standard, not rushed at the end.
New construction, tenant improvements, renovations, and remodels, across the Greater Pittsburgh area.
Get a quoteCOI before day one
Certificate of Insurance sent to your office in one click, before our crew sets foot on the site. Insured, on record.
We work the deficiency list
Find something we missed on the walk? It goes on the list and it gets handled. No "it was construction, what do you expect."
Photo-documented handover
Every phase ends in photos. You sign off on the space without standing in it, and you have a record for the owner.
Trade-sequenced scheduling
We slot into your schedule, not the other way around. Tell us the sequence and the date, and we hit the window.
What GCs and builders ask us.
What does post-construction cleaning cost?
It runs by square footage and how much the site needs, roughly $0.15 to $0.60 per square foot depending on rough versus final and the debris level. Send the scope and you get a real number, not a range.
Do you do all three phases or just the final?
Either. Some jobs want the full rough-final-touch-up sequence, some just want the final clean before handover. Tell us where you are in the build and we scope to it.
How fast can you mobilize?
Fast. Quote requests answered same day. For active builds on a deadline, tell us the date and we staff to hit it.
Do you work with general contractors on multiple projects?
Yes. Repeat GC and builder work is core to what we do: one point of contact, one standard, project after project, with a COI on file for each.
If it’s not spotless, we’re not done.